After much effort, our team has successfully assembled the physical model of our Pop-up structure at B.15. This hands-on project provided BA2 students team with valuable insights into the intricacies of joineries involved in crafting a modular mobile structure. The end result is truly exciting, as our team delved into various flexible configurations during the experimentation phase.
Posted 17 May 2024 17:32