Day 5: Truss & Laser cut & Material research

Group A cut their first truss and laser cut based on the laser cut files on Day 5. At the same time they did some model material research, trying to restore the building's material finishes.The material research and laser cutting were carried out simultaneously to ensure that the best effect of the building materials could be achieved quickly after the model lapping was completed.
Posted 16 May 2023 19:02
Day 7: Painting truss & windows & doors

Group A began painting and gluing the cut Truss today in preparation for the roof section the next day. At the same time, according to the site survey photos, the doors and windows of the color. In order to restore the true indoor effect, the indoor floor material coloring test was carried out.
Posted 18 May 2023 11:02